Survayor’s Particular
Designation
Experience
Before starting any development work, choosing the Best Construction Company in Bangladesh is the most important step. Construction is not just about bricks and mortar — it’s about creating a durable, functional, and aesthetic structure that stands the test of time. SUCHANNA CONSTRUCTION LTD., one of the leading construction firms in Bangladesh, offers complete end-to-end building and infrastructure solutions.
We have successfully completed more than 300+ major projects across the country, ranging from residential and commercial buildings to bridges, industrial complexes, and government infrastructures. Our skilled engineers, architects, and project managers ensure quality, safety, and timely delivery in every project we undertake.
Planning to build your future project? We are ready to serve you. Over the last decade, we have successfully delivered multiple mega projects across Bangladesh. Some of our major accomplishments include:
10+ Industrial and Power Projects under China Energy Engineering Group (CEEG).
Jahanabad Cantonment Housing Complex, Khulna – 250 Acres Development.
Pallathol Tea Resort & Villa, Moulovibazar – 870 Acres of Land Development.
ADB Financed Muhuri Irrigation Infrastructure Rehabilitation Project – 240 km of structural work.
IPCO Airport Village Complex, 2,50,000 SFT Commercial Construction.
Currently, we are proudly working with PWD, RHD, LGED, WDB, PDB, and Bangladesh Army in several ongoing mega projects.
| SI | Description of Works |
|---|---|
| 01 | Residential Building Construction |
| 02 | Commercial Building Construction |
| 03 | Industrial and Factory Construction |
| 04 | Road and Highway Construction |
| 05 | Bridge and Culvert Construction |
| 06 | Drainage and Sewerage Construction |
| 07 | River Bank Protection Work |
| 08 | Pile Foundation and Deep Excavation |
| 09 | RCC & Steel Structure Work |
| 10 | Architectural Design & Structural Detailing |
| 11 | Interior and Finishing Work |
| 12 | Land Development & Earthwork |
| 13 | Retrofitting and Renovation Work |
| 14 | Boundary Wall and Pavement Work |
| 15 | Construction Project Management (EPC) |
| SI | Equipment Description | Quantity |
|---|---|---|
| 01 | Excavator | 6 Nos |
| 02 | Dump Truck | 10 Nos |
| 03 | Concrete Mixer Machine | 12 Nos |
| 04 | Vibrator & Compactor | 15 Nos |
| 05 | Rebar Bending & Cutting Machine | 8 Nos |
| 06 | Scaffolding System | 5,000 Sft |
| 07 | Total Station & Leveling Instruments | 3 Set |
| 08 | Generator & Power Unit | 4 Nos |
| 09 | Safety Equipment & Tools | 50 Set |
| 10 | Project Vehicles | 5 Nos |
SUCHANNA CONSTRUCTION LTD. has been serving the construction industry for more than 13 years, successfully delivering government, corporate, and private projects. From infrastructure to high-rise buildings, we’ve handled diverse challenges with utmost professionalism.
We operate across all 64 districts of Bangladesh. Our project teams can mobilize equipment and workforce to any district within 24 hours of confirmation. Even in hilly and coastal zones like Bandarban, Khagrachari, and Kuakata, we ensure uninterrupted service.
Our engineers, site supervisors, and technicians are qualified from reputed institutions such as BUET, CUET, and BIT. Each project is managed under strict technical supervision to ensure quality, safety, and efficiency.
Every project is executed under international quality control standards. We ensure structural stability through rigorous material testing, lab inspections, and on-site quality assurance. Our concrete strength and finishing quality exceed industry benchmarks.
We maintain zero-tolerance safety policies at every project site. All workers are provided with PPE, and site activities are monitored through real-time progress tracking. Our project data, drawings, and BOQs are stored securely in our digital system.
We understand the value of time in construction. Hence, we implement project scheduling software (MS Project, Primavera) to ensure each milestone is achieved on time. Many of our clients have praised our on-time delivery record.
We use modern machinery and techniques like ready-mix concrete, pre-fabricated structures, and 3D modeling. Our in-house design studio prepares BIM-integrated project plans for precise coordination between architecture and structure.
We provide competitive rates without compromising quality. Our transparent costing method ensures clients know where every taka is spent. From small residential projects to large industrial plants, we offer customized pricing.
To ensure accuracy and performance, all our heavy and light machinery are calibrated and serviced regularly by certified experts. We follow BUET’s calibration standards to ensure top performance of our tools and instruments.
We have the capacity, manpower, and technology to handle any mega project in Bangladesh. Our project portfolio includes ADB-financed, Power Development Board (PDB), and China Energy Engineering Group (CEEG) works.
| SI | Client | Project Description | Location | Area/Scope |
|---|---|---|---|---|
| 1 | Bangladesh Water Development Board | Canal Protection and Structural Works under Muhuri Project | Feni–Comilla | 240 km |
| 2 | Bangladesh Army | Jahanabad Cantonment Housing & Infrastructure | Khulna | 246 Acres |
| 3 | LGED | Rural Road & Bridge Development Project | Chittagong | 30 km |
| 4 | PWD | Multi-storied Government Office Building | Dhaka | 18 Storied |
| 5 | DNCC | Drainage and Road Construction Works | Mirpur | 12 km |
We offer complete construction solutions: residential, commercial, industrial, infrastructure, and government projects including RCC, steel, and pre-engineered structures.
We have been working since 2012, with over 13 years of experience and 300+ successful projects.
We provide services in all 64 districts of Bangladesh, including hilly and coastal zones.
Our strong engineering team, advanced technologies, and commitment to timely delivery make us stand out as one of the Top Construction Companies in Bangladesh.
We follow ISO 9001:2015 standards for quality control and strict safety policies for all workers and engineers on-site.
We usually take 50% advance at project confirmation and the rest upon milestone completion or delivery.
Yes, all our drawings and reports are approved by RAJUK, PWD, and local authorities.
Yes, our in-house architectural and structural design team provides planning, layout, 3D visualization, and BOQ preparation services.
Yes, we provide retrofit, repair, and renovation services for both residential and industrial buildings.
Absolutely. We have the manpower, logistics, and financial strength to handle any mega project in Bangladesh.
Bangladesh is a small but densely populated country. A piece of land is most valuable and precious. The Capital city Dhaka is overpopulated, and the scarcity of land is growing day by day. To utilize your precious land, a Survey is the most important part before going through any infrastructural development. A reputed and experienced Survey Company can Assist you in the proper use of your valuable land.
Land always may not be in regular shape and size. It may be irregular in horizontal or vertical undulations. Whatever the irregularities, we need to know the accurate shape and size of the prospective land. Any analog or manual survey cannot mitigate and resolve these issues. A Land Survey using a Total Station Machine can ensure the ultimate shape and size of land with dimensional accuracy. We at SHELLMARK have been dealing with Conducting survey work for more than 13 years.
Whether you are planning to have a piece of land or plan to develop your existing land, you just need to know the Topographical features of the proposed land. A Topographic Survey will provide you’re the exact features of the land. The Land features are boundary demarcation, internal or external road networks, transmission lines, the position of utility lines, water bodies, existing structures, trees, canals, etc. Also, the survey covers any other visual objects in the project catchment area. These features are most important in making any valuable decision about the esteemed project.
Maximum utilization of land is a pre-requisite of any Residential, Commercial, Institutional, or Industrial Development works. Land Surveys can ensure the proper use of land. Most Architects, Planners, or Engineers ask to conduct a Topographic or Contour Survey before starting their planning or designing works. They always look for precise dimensional accuracy of land size and angular specification of the project.
Most of the shared land or paternal property comprises complicated boundary disputes. If you plan to have any plot or want to divide your paternal property. Firstly, you must mitigate the boundary anomalies. Conducting a survey work may lead you to mitigate the boundary issue or any horizontal and vertical irregularity. SHELLMARK is assuring to maintain the highest level of accuracy in resolving such disputes by conducting Survey works using the Total Station Machine.
Land always may not be level, there must be some undulation. Especially in Barendra Bhumi and Hilly areas are irregular both vertically and horizontally. Before starting any development, the land must be leveled. In this case, the same land somewhere needs land cutting and somewhere needs landfilling. Contour Survey provides the actual cutting and filling volume. It helps to estimate the Land Development budget accurately which saves unwanted expenses.
Some Mega Project requires a Global Position of Land i.e. Latitude and Longitude. GPS and RTK GPS Survey provide the actual global position of land using satellite signals. It also provides the relative positions of plot objects and their vertical differences. Some lands are not easily accessible. In that case, the Drone Survey may cover the entire survey without taking the physical measurement of land.
As per our above discussion, we can conclude that an accurate Survey is the most important part of any project. So, try to engage an experienced and Best Digital Land Survey Company in Dhaka, Bangladesh to Conduct Survey works to obtain the ultimate accurate results. This may lead you to optimum use your valuable time and Property.
Most of the Survey reports include the Land boundary. Whether it is regular in shape or irregular boundary demarcation, the primary task of a land survey is to fix the plot boundary. Before conducting the survey, you have to solve the boundary conflict first. Whether the plot has a boundary wall or not, it doesn’t matter in Survey Works.
The second Primary content of a survey report is the actual Land area calculation. There is no better way to find the exact land area except a survey. We use the total station machine to conduct a Survey which is the most accurate EDM device in the world.
The proposed surface of the land may not be in the same Level. Sometimes, the land is found very undulated in a different position on the same plot. The survey report includes the Reduced Level (RL) of different places. The temporary RL has been fixed and marked in a permanent structure. The Elevation of Land with respect to connecting roads has also been computed in the report.
Gas, Water, and Electricity are the main utilities of a plot. The survey Report must include the position of the Gas and water Lines. It also includes the position of the Electric Post and way of transmission Lines. Underground water reservoirs and Deep tube wells are also computed in survey reports.
The proposed plot always may not in vacant. There may be some buildings or many other structures. The actual location and size have been computed in the survey report. Sometimes, the Elevation of the buildings and the number of stories is mentioned.
Every plot contains a connecting road. In the case of large plots, there may be internal road networks also. The survey reports include the actual position of roads and their width. There may be drainage systems inside the plot. The survey report includes them also.
The land survey report includes information on adjacent Land use. The surrounding Landowner also been computed in the report. Adjacent building types and their story heights have also been plotted in the digital survey report.
Before Developing Land, a Finished Ground Level (FGL) has to be fixed. In the case of low Land, the earth may be filled to achieve FGL. For undulated highlands, the earth may be excavation to reach the FGL. Surveys provide the calculation of the amount of earth cutting or Filling.
Survayor’s Particular
Designation
Experience
Sarwar Alam
Co-ordinator
18 Years
Md. Mustafizur Rahman
Sr. Surveyor
15 Years
Md. Zunayed Hossain
Sr. Surveyor
15 Years
Syed Anwar Rockey
Sr. Surveyor
13 Years
Motiur Rahman
Surveyor
12 Years
Shohel Rahman
Surveyor
12 Years
Ananda Chandra
Surveyor
10 Years
Muhaimenul Islam
Surveyor
7 Years
Faisal Kabir
Surveyor
5 Years
Uzzal Tripura
Surveyor
5 Years
The land survey is a process by which Land is measured by electronic devices. The collected data is being processed through application software. The final output is being plotted in CAD format.
We use some electronic devices like. Total station Machine, Dumpy Level, and Theodolite. Mostly we use the Latest survey machine “Total Station”. It’s because Total Station can measure both Horizontal and Vertical coordinates.
Yes! Experience matters. We have been providing survey services since 2012. It’s more than 13 Years and we have completed more than 250 Surveys in Bangladesh.
Basically, survey works do not mitigate the boundary dispute of Land. So, before stating the survey Works, we need the boundary demarcation. We always expect the presence of the Landowner at the site during survey works in progress.
The cost of a plot survey within Dhaka City Starts from Tk.10,000/. The survey cost depends on the size of the plot and existing topographic features. Our plot survey outside Dhaka City stats from Tk.25,000/plot. In the case of large projects, we have customized and negotiable price plans.
Yes, we have. You can hire our surveyor daily. In that case, the hire charge for 2 2-person survey team is Tk. 10,000/day. The conveyance, arrangement of food, and accommodation are to be provided by the client. At least half an advanced payment is to be made with the work order upon estimated Days. The client must have settled down the total number of days in advance.
Our surveyors are diploma holders from reputed survey Institutes. Most of our surveyors have more than 10 years of experience. We also engage experienced survey assistants in our survey work. We do not recruit Trainee surveyors in our company.
Generally, we have a provision of half of the payment in advance. We confirm the data of the survey after getting the advanced payment. The rest amount is to be paid at the time of project delivery. In case of courier delivery, Final payment is to be made before booking the report to the courier.
We always try to make our work more accurate. Our survey reports are accepted by RAJUK, City Corporations, and Pourashavas. You can also, use it for any dispute purpose. We deliver Land survey reports duly signed by our company’s Authorized personnel. Our survey reports are accepted by any authority in Bangladesh.
We have 64 district services coverage. Our team is capable of moving to any remote place within 24 hours. We have working experience in the hilly and coastal areas also.
© 2025 SUCHANA ENGINEERS LIMITED CREATED BY VIRTUAL SOFTBOOK.